Key Highlights

General & Architecture

  • Super built up area
    Approx. 2.5 mn sq.ft.
  • No. of floors
    Block A and B- Ground +11; Block C- Ground +12
  • Design Standards
    Platinum LEED Certified by USGBC
    Design as per NBC and Local by-laws
  • Slab thickness
    225 mm flat slab with 450 mm capital thickness
  • Typical / Flooring Load
    Live load of 400 Kg / sq.mt.
  • Screed depth on floor
    55 mm
  • Typical column grid
    10.8 m X 10.8 M approx
  • Floor to floor height
    4.2 mt.
  • Floor plate efficiency
    80% (Office area to Super Area efficiency)
  • Passenger elevators and Speed
    16 No. high speed lifts in each Block
  • Service elevators
    2 No. in each Block

Technical Specification

HVAC

  • Chiller
    5x1500 TR including partially standby, water cooled centrifugal chillers, located in basement
  • Design Parameters of Chiller
    Chiller inlet temperature is 13.3°and outlet is 6.7°
  • AHU rooms per floor
    4 No. each floor each block with double skinned AHU & VFDs integrated. BTU meters provided with AHU
  • BMS system
    HVAC integrated with BMS system

ELECTRICAL

  • Power source
    2 sources (one from Electric Grid & one from DG set)
  • DG rating and configuration
    11 No. 2250 kVA, 11 kV, water cooled type
  • Power for internal consumption
    0.005 kVA per sft of Leasable Area. HVAC power is separate
  • Type of power distribution till floor level
    Through dual rising mains

FIRE SAFETY

  • Fire pump room location
    Basement-1
  • Fire exits per Block
    5
  • Stair case width
    2 mt.
  • Sprinkler arrangement
    Single layer of upright sprinkler
  • FA & PA system for common area
    Provided Integration of tenant fire panel allowed building fire panel
  • Security Services
    CCTV manning for all common areas like basement parking, lift lobbies, building periphery.
    Access control to basements through boom barriers
    Manual security through security guards for 24 hours in building and periphery

PLUMBING

  • Sewage treatment disposal
    Centralized STP in basement using MBR method
  • Water Pressure available at floor level
    1.5 Bar

REALITIES & AMENITIES ZONE

  • Food court & amenities on the ground floor.
  • Atrium cafes, convenience stores, gymnasium, banks, ATMs etc.
  • Roof terraces with conferencing & banquet opportunities.
  • Dedicated pick up & drop points for cabs.
  • Landscaped outdoor spaces & water bodies.